Gas2Power Solutions
Cryogenic Systems

Engineering at the
Edge of Cold.

Gas2Power's cryogenic engineering team operates at the most demanding extreme of the energy infrastructure spectrum — designing, building, and maintaining systems that manage LNG at −162°C with zero tolerance for error.

−162°C Operations99.8% IntegrityBOG RecoveryFSRU Integration

— Overview

Precision engineering where temperature and safety are everything.

Cryogenic engineering is not a specialty — it is the foundation of the entire LNG value chain. Every terminal, every FSRU, every satellite storage facility depends on engineering that operates without failure at temperatures that would destroy conventional materials. Gas2Power's cryogenic team combines 15+ years of LNG cold chain experience with proprietary engineering methods developed on live infrastructure.

−162°C

Operating Temp

99.8%

System Integrity

48+

MTPA Throughput

15+

Years Experience

— Core Capabilities

Every system in the LNG cold chain.

Storage

LNG Storage Tank Engineering

Full containment and membrane LNG storage tank design, contractor qualification, inspection systems, and commissioning management.

Transfer

Cryogenic Transfer Systems

Unloading arms, cryogenic piping, flexible hoses, and emergency release couplings for ship-to-shore and FSRU transfer operations.

BOG

BOG Management Systems

Boil-off gas recovery compressors, reliquefaction systems, and reinjection infrastructure that converts losses into recoverable energy.

Vaporization

Heat Exchanger Design

Open rack vaporizers (ORV), submerged combustion vaporizers (SCV), and ambient air vaporizers (AAV) sized for your send-out requirements.

Instrumentation

Cryogenic Instrumentation

Temperature, pressure, flow, and level measurement systems rated for LNG service, with redundant sensor architectures.

FSRU

FSRU Systems Integration

Full cryogenic systems engineering for FSRU vessels including mooring, hawser, loading arm, and emergency disconnect systems.

— Engineering Depth

Built for the limits of what is possible.

— Thermal Control

Thermal Management Systems

Continuous thermal gradient monitoring across tank insulation layers, predictive BOG generation modeling, and automatic control of pressurization and cooldown systems.

Gas2Power LNG cryogenic facility outdoor piping and process systems

— BOG Recovery

BOG Recovery as Energy Asset

Gas2Power reframes BOG not as a loss but as a recoverable energy source. Our BOG management systems integrate with turbine fuel supply, reliquefaction trains, and grid-connected power generation.

Gas2Power LNG technicians commissioning cryogenic equipment

— Engineering Process

From assessment to safe handover.

Cryogenic Assessment

System Design

Material Specification

Fabrication & Testing

Installation

Commissioning & Handover

— Operational Record

Cryogenic systems. Proven in the field.

Full Containment Tank

Southeast Asia

12 MTPA full containment LNG storage facility with integrated BOG management.

12 MTPA

Capacity

180,000 m³

Tank Type

98%

BOG Recovery

FSRU Cryogenic Systems

Middle East

FSRU cryogenic systems overhaul extending vessel operational life by 12 years.

138,000 m³

Vessel

12 yr

Life Extension

99.9%

Integrity

Satellite Storage

Northern Europe

Peak-shaving satellite LNG storage facility for gas distribution network.

2,200 m³

Storage

45 t/h

Send-out Rate

3 Active

Applications

— What You Get

Zero tolerance. Zero compromise.

  • Purpose-designed for −162°C operations
  • Full containment, membrane, and FSRU tank expertise
  • BOG management as energy recovery, not just cost control
  • Material qualification and welding procedures
  • Pressure test and cool-down planning
  • Cryogenic instrumentation specification and procurement
  • Inspection and non-destructive testing
  • Emergency systems engineering and safety reviews
  • Integration with SCADA and process control
  • Post-commissioning support and training

Start a Project

The right infrastructure partner changes everything.

Tell us about your energy infrastructure needs. Whether you're a government, utility, investor, or hyperscale operator — our team responds within one business day with a tailored engagement plan.

Houston, TX — Global HQOperations across 30+ markets worldwide
24/7 Operations Center Available
ISO 9001 Certified15+ Years30+ Markets6 Continents

Start a conversation

We respond within 1 business day. All information is kept confidential.